Phase 06: Stage-wise Quality Audits, AMC BU Permission & Seamless Handover
Phase 6: Independent Quality Audits, AMC BU Permission & Key Possession
STEP 06 OF THE 6-PHASE ROADMAP

Stage-wise Quality Audits, AMC BU Permission & Seamless Handover

A newly constructed home must be built to the highest structural standards and handed over without defects. Builders frequently compromise on internal fittings, waterproof membranes, or elevator specifications toward project completion. Rapido Realty LLP deploys seasoned civil quality engineers throughout construction and oversees the rigorous inspection required for AMC Building Use (BU) permission and final key handover.

Key Deliverables of Phase 06

  • Stage-Wise Civil & Material Audits: Independent testing of concrete compressive strength (cube tests), Fe500D/550D TMT reinforcement steel testing, waterproofing flood tests, and verification of specified brand fittings (plumbing, wiring, tiles).
  • AMC Building Use (BU) Permission Compliance: Comprehensive scrutiny of AMC BU inspection compliance, verifying fire safety NOC, lift inspection certificates, drainage connectivity, and percolation well rainwater harvesting installations.
  • Flat-by-Flat Snag Listing & Rectification: Meticulous inspection of each member’s apartment checking hollow tiles, door alignments, plumbing leaks, window sealing, and electrical earthing before signing the handover punch list.
  • Corpus Fund Disbursement & Warranty Handover: Ensuring 100% corpus funds and bank guarantees are settled, handing over original manufacturer warranties, equipment AMCs, and structural stability certificates to the newly formed society committee.

GUJRERA 5-Year Structural Defect Liability

Under Section 14(3) of RERA, the developer is legally obligated to rectify any structural defect or other defect in workmanship, quality, or provision of services that is brought to their notice within a period of 5 years from the date of handing over possession, at zero extra cost within 30 days.

Rapido Realty LLP assists the society in documenting all baseline conditions at possession, ensuring the 5-year statutory defect liability clause is recognized and enforceable against the developer.

Legitimate BU Clearance

We ensure members only accept possession once the official AMC Building Use (BU) permission is granted, avoiding illegal occupancy notices.

Joyful Community Handover

From Griha Pravesh key handover to new share certificate distribution, we accompany the society until the entire project is completed.